Thursday, January 30, 2014

Non submission of project synopsis (updated list as on 31.1.14)

The following students have not submitted their project synopsis. If we do not receive the same by this Saturday i.e., Feb,1 you shall be awarded -50% in the internal.


Roll No
90107043
90107084
90107086
100107055
100107108
100107145
100107147
100107155
100107156
100107157
100107161
100107175
100107184
100107199
100107212
100107240

List of Unregistered Students

List of Unregistered Students

If you have registered yourselves and still find your name in the above list, meet me.

Wednesday, January 29, 2014

PROJECT GUIDE ALLOCATION (updated on 30 1.14)

Students are required to contact their respective Guides for the evaluation of their weekly progress and attendance from this week itself.
They are required to come to their Guide with their detailed synopsis specifying their total progress of work with time duration.
Do report if their is any doubt.


 Here is the link for the list of guides for the respective projects. 

Microwave Remote Sensing Course

ISRO and Sharda University is orgainsing a course on “MICROWAVE (SAR) REMOTE SENSING FOR NATURAL RESOURCES”. 

SHARDA UNIVERSITY WILL BE TELECASTING LIVE LECTURE/PRACTICAL OF THE PROGRAMME FROM IIRS IN A DEDICATED CLASSROOM WITH FACILITIES.   

COURSE DURATION: 03RD FEB TO 29TH MARCH 2014 (4/5 DAYS WEEK)            
COURSE TIMING:  4.00 P.M TO 5.30 P.M
VENUE: SET, SHARDA UNIVERSITY, GREATER NOIDA.                                           
NO. OF SEATS:   50 LIMITED (FIRST COME FIRST SERVE BASIS)
                                                         
REGISTRATION FEES: Rs.300/- 
(INCLUDES CERTIFICATE, EXAM FEES, NOTEPAD, PEN & REFRESHEMENT) 
(LATE REGISTRATION RS.100/- EXTRA)  

LAST DATE FOR REGISTRATION:    29TH JAN 2014


ELIGIBILITY: FINAL YEAR B.TECH STUDENTS AND M.TECH STUDENTS. 

FOR THOSE ATTENDING THIS PROGRAM UNIVERISTY WILL PROVIDE BUS FACILITITY UPTO SECTOR 32, NOIDA METRO STATION IN THE EVENING.

Placement Notice: Apaar Infratech

Company Name
Apaar Infratech

Target Degrees & Branchesce
B Tech (Civil)
CTC Upto 15 K
Designation
GET 
Joining Location
NCR
Joining Date/Month
Immediate
Selection Process
(No. of Interview Rounds)


 Written Technical Test
Face to Face Technical Interview


Percentage Cut-off
 60% throughout

Any Bond
2 Years 
Campus Date & Time  10th Feb 2014
At Sharda University





Tuesday, January 28, 2014

UFM cases meeting

The meeting of CUM, for deciding the cases of UFM (Major and Minor) in
the odd Term Examinations, is being scheduled on Jan 30, 2014 at 11:30
am in the office of the COE.

Following students have to report for the meeting.

Minor.
1) Shubham Verma  2012004140  120107221
2)Akshay Sharma    2011000456   110107026


Major
1) Vishwajeet Singh 2012011255  120106283
2)Rajan Sharwan   2012011613   120107185


Minor:

2010000629  Briddhi Chandra Giri  100106803

2010000318 Ankit Raghuvanshi 100106061

2010001779  Gabriel Toby  110121040

2010001164  Nikhil  100107136

Major:

2011001203  Ravi Tiwari  110106218

2011000866  Kumar Pratik  110106119

2009001140  Shubhendra Varshney  090107139

2011000624  Bhaskar Kumar Chaudhary  110122011

2011001032  Nedem Ahmed  110122032

2011000333  Akhil Dhaka  110107025

2011001595  Vaibhav Guliyan  110107210

2011001121  Pavan Kumar Varshney  110107132

Minor.
1)      Akhilesh Kumar Singh 10SETCIVL115(2010000361) 100107018
2)      Mayank Bhardwaj        10SETCIVL182(2010001019) 100107108
3)      JIbran Naveed              10SETCSE288(2010000859) 100101099
4)      Vempati Anvesh           10SETCSE343(2010002472) 100101260
5)      Ankit Anand                 10SETECE251(2010000452) 100103047

Major
1)        Henery Gani 10SETIT231(2010000748)    100102032

Changes in Open Elective

Anybody wishing to change their open elective can submit an application to me, LATEST BY 30th Jan providing reasons that why they would like to change their course. However, merely application does not guarantee you the change. It will depend upon the number of applications received and the seats available in the course of your choice. Keep in mind that your course may or may not change.

Monday, January 27, 2014

Feedback form for T Shirt

Those who are interested in having a customized T Shirt as a farewell gift may give their option in the below link,



Live Webinar on Indian Construction Industry

A webinar on Indian Construction Industry is being organised on 28th Jan, 2014 (Tuesday) at 03:30pm. You can join this for free and get more on the Indian Construction Industry. The details are in the below link.

Live Webinar (Tuesday 28th Jan, 03:30-04:30pm)

Click this link to register

Click here for "System Requirement"

syllabus for the 8th term (Jan14)

The syllabus for the current term can be downloaded from this link

Saturday, January 25, 2014

CVL013: Design of Prestressed Concrete - Tutorial 01

The Tutorial Sheet 01 for CVL013: Design of Prestressed Concrete can be accessed from the link below.

Tutorial 01.

The Class Test, based on the above Tutorial Sheet, will be conducted in the following week for all the Sections in their respective Tutorial Classes.

The students are requested to practice the above Tutorial sheet and come prepared for the Class Test, which will be considered for the Continuous Assessment (CA) Marks.

Students are also requested to bring their own calculators and Indian Standards (IS1343:1980). Use of Mobile Phone and borrowing or lending of stationery items during the class test will be strictly restricted.

Please share this to your friends.

Friday, January 24, 2014

Thursday, January 23, 2014

deewan housing interview UPDATE

Those students who have managed to achieve 60% after 7th term examination are also eligible to appear in tomorrow's and all other interview where eligibility criteria is 60%. Such students can give their names to manzar who will get the same approved from me for you to appear in the interview.

Those who are now eligible and do not have their co-cube id may give their names to manzar who shall get the approval from me for you to appear in tomorrow's interview.



Deewan Housing and Finance Limited: Interview on 24th Jan


INTERESTED AND ELIGIBLE STUDENTS MAY GIVE THEIR NOMINATIONS THROUGH WWW.COCUBES.COM

INTERESTED STUDENTS ARE ADVISED TO REPORT TO AUDITORIUM-102, SET-3 at 9:30 AM SHARP TOMORROW (24th JANUARY 2014) FOR PRE-PLACEMENT TALK.

AFTER THE PPT, THE STUDENTS ARE ADVISED TO ASSEMBLE IN ROOM NO-202 AND 203 IN THE PGDM BUILDING FOR FURTHER PROCESSES.



Company Name
Dewan Housing Finance Corporation Ltd (www. dhfl.com)
Target Degrees & Branches
B.Tech (Civil)
60% and above in B.Tech

CTC
INR 3.0 LPA

Training duration 2 months. Package would be 3.0 LPA during training also
Campus Date & Time
24th January 2014
Selection Process
(No. of Interview Rounds)
Group Discussion

Technical Interview

CVL013: Design of Prestressed Concrete - Syllabus and Instructional Plan

The Syllabus and the Instructional Plan for the course CVL013: Design of Prestressd Concrete can be accessed from the following links

  1. Syllabus
  2. Instructional Plan

Rockman Industries and Meeting with HOD

The JD of Roackman Industries have been floated. You must have seen the JD. Those who have not, may get the details from the placement co-ordinators.

There are 114 eligible students (60% throughout). From this only those who apply through co-cubes shall be eligible to appear in the interview.

APPLY for this company through co-cube. THE LAST DATE is 27th January. 

I would like to meet all the students of final year civil engg in 102, set3 today at 02:00pm

Wednesday, January 22, 2014

PRELIMINARY GUIDELINES FOR FINAL YEAR PROJECT WORK

PRELIMINARY GUIDELINES FOR FINAL YEAR PROJECT WORK
1.            Make groups of maximum 3-4 students.
2.     Decide the topic and submit it to any of the four co-ordinators latest by 24th Jan`14.
3.         You shall be awarded a guide depending upon the topic you have submitted. This shall be done by 28th January.
4.      Submit a copy of the synopsis to the guide and if changes are required, incorporate the same.
5.       In consultation with your guide, prepare the methodology for the project and submit it to your guide.
6.       Individual project diary (with dates) is to be maintained by each student in a group for weekly evaluation by their project guides (out of 10 marks).
7.        The guide shall award a marks in the diary every week and shall keep the record with him as well
8.        A group dairy should also be maintained showing the weekly progress of the project with dates.
9.        Any student not reporting to his/her guide for the particular week will get zero marks for that week.
10.       Rough draft of the Thesis is to be submitted first to their respective guides by 22nd March`14 positively.
11.     Final Thesis will be submitted at the end of the semester (latest by 11th April, 2014) only after the correction of the rough draft.
12.       Project will be evaluated based on the quality and quantity of the work done.
13.       Students will be judged based on their oral presentation and questions and answer session and also on the quantity of work understood by the student himself regarding his/her project.

14.   The details of the evaluation criteria and the marks distribution shall be communicated to you soon.

Monday, January 20, 2014

STUDENT-INDUSTRY INTERACTION-VALUE OF PROJECT MANAGEMENT

SBS and Department of Corporate affairs are organizing STUDENT-INDUSTRY INTERACTION-VALUE OF PROJECT MANAGEMENT program on 21st January, 2014 at 10 A.M. in PGDM Auditorium.
TECHNICAL SESSION-1 : VALUE OF PROJECT MANAGEMENT IN THE INDUSTRY- CERTIFICATION REQUIREMENTS -- MR.VIVEK SHALLY, HEAD, EDUCATION INITIATIVE, PMI, NEW DELHI
TECHNICAL SESSION-2:

NEED OF PROJECT MANAGEMENT IN SOFTWARE DEVELOPMENT PROJECTS -- MS.PARAMITA MUKERJI, WIPRO

TECHNICAL SESSION-3: PROJECT MANAGEMENT PROCESS MATURITY FOR TELECOM AND OTHER INDUSTRIES -- MR.ABHISHEK GUPTA, ERICSSON

Open Elective Classrooms

The details of open elective classrooms can be found from this link

Lecture notes for Quantity Surveying (OEL 011)

Lecture notes and other instruction material can be found at the following link (Look into folder named 'Quantity Surveying'):

https://sites.google.com/site/civilsharda2010/downloads-1

Saturday, January 18, 2014

New TT wef 20th Jan

The new TT wef 20th Jan, 2014 can be accessed from this link.

Project allotment for the final term: URGENT

The final year project have to be allotted to the all the students in this week (20-24 Jan) itself. You have to contact any one of the following faculty members for the same,

Gaurav Saini
Pinaki Nayak
Meenu Kalra
Satyaprakash

Guidelines,
* Make  a group of maximum 4 students
* Prepare a synopsis on what you would like to do, with the title of the project.
* The synopsis should not be more than one page.
* Based upon the submission, a guide from among the faculty shall be allotted
* NO GROUP SHALL BE ENTERTAINED AFTER 24TH JANUARY, UNDER ANY CIRCUMSTANCES
* Final list of project, title and the guide shall be displayed by 28th January, 2014

Once this is completed then you shall be briefed about the evaluation process and procedure for keeping a record of the work.


Friday, January 17, 2014

Students List with subjects, groups and academic counsellors

The below list contains the list of the students with their sections, groups, academic counselors and the subjects they shall be studying in the current term.

Students List with subjects, groups and academic counselors

Any request of change in the section/ group shall not be entertained.


revised co-cube test

the revised co-cube test schedule is as,

CoCubes Pre-Assessment Program  Date:- 17/11/14 (9:00 AM - 12:00 Noon)
Floor Lab No Department DCA Coordinator Faculty Coordinator Number of students
1st  Floor 201-A CSE Mr. Kulbhushan CSE Faculty-1 35
1st  Floor 201-B CSE Mr. Kulbhushan CSE Faculty-1 35
1st  Floor 201-C CSE Mr. Kulbhushan CSE Faculty-1 35
1st  Floor 201-D IT Ms. Somya IT Faculty-1 35
1st  Floor 206 IT Mr. Santosh IT Faculty-2 30
7th Floor 805-A IT Mr. Sidharth IT Faculty-3 30
7th Floor 805-B CSE Mr. Sidharth CSE Faculty-2 35
7th Floor 805-C CSE Mr. Paras CSE Faculty-3 35
7th Floor 805-D CSE Mr. Paras CSE Faculty-3 35
7th Floor 805-E BIOTECH Ms. Shikha Biotech Faculty-1 35
8th Floor 905 BIOTECH Mr. Sachin Biotech Faculty-2 40
SET 1  314 MCA Ms. Shikha MCA Faculty 1 50
SET 1  402 CIVIL Ms. Somya EIE Faculty 1 30
RAC   CIVIL   Civil Faculty-2 35
CoCubes Pre-Assessment Program  Date:- 17/1/14 (1:00 PM - 4:00 PM)
Floor Lab No Department DCA Coordinator Faculty Coordinator Number of students
1st  Floor 201-A ME Mr. Kulbhushan ME Faculty-1 35
1st  Floor 201-B ME Mr. Kulbhushan ME Faculty-1 35
1st  Floor 201-C ME Mr. Paras ME Faculty-2 35
1st  Floor 201-D ME Mr. Paras ME Faculty-2 35
1st  Floor 206 ME Mr. Sachin ME Faculty-3 30
7th Floor 805-A ME Mr. Sidharth ME Faculty-4 30
7th Floor 805-B ME Mr. Sidharth ME Faculty-4 35
7th Floor 805-C CIVIL Mr. Paras AE Faculty-1 35
SET 1  314 CIVIL Mr. Kulbhushan Civil Faculty-1 50
SET 1  402 CIVIL Mr. Kulbhushan Civil Faculty-1 35
RAC   CIVIL   Civil Faculty-2 35
CoCubes Pre-Assessment Program  Date:- 17/1/14 (4:30 PM - 7:30 PM)
Floor Lab No Department DCA Coordinator Faculty Coordinator Number of students
1st  Floor 201-A ECE Mr. Kulbhushan ECE Faculty-1 35
1st  Floor 201-B ECE Mr. Kulbhushan ECE Faculty-1 35
1st  Floor 201-C ECE Mr. Kulbhushan ECE Faculty-1 35
1st  Floor 201-D ECE Ms. Somya ECE Faculty-2 35
1st  Floor 206 ECE Mr. Santosh ECE Faculty-3 30
7th Floor 805-A ECE Mr. Sidharth ECE Faculty-4 30
7th Floor 805-B ECE Mr. Sidharth ECE Faculty-4 35
7th Floor 805-C ECE Mr. Paras ECE Faculty-5 35
7th Floor 805-D ECE Mr. Paras ECE Faculty-5 35
7th Floor 805-E EEE Mr. Sachin EEE Faculty 1 35
8th Floor 905 EEE Mr. Sachin EEE Faculty 2 35
SET 1 314 EEE Ms. Shikha EEE Faculty 3 35
SET 1 402 EEE Ms. Priyadarshi EEE Faculty 4 40
RAC   EIE Mr. Sidharth Civil Faculty-3 30
RAC   AE Mr. Sidharth Civil Faculty-3 35

Thursday, January 16, 2014

Time table effective from Jan 17

co-cube test as scheduled

Please ensure that you attend the CoCubes Pre-Assessment test as per the attached schedule. No second chance will be given except for those who are going for Optimus Information and Navy SSB.

The schedule for the test is as,

The test shall be conducted on first cum first basis.

There shall be no classes tomorrow for final year students.

CoCubes Pre-Assessment Program  Date:- 17/11/14 (9:00 AM - 12:00 Noon)
Floor Lab No Department DCA Coordinator Faculty Coordinator Number of students
1st  Floor 201-A CSE Mr. Kulbhushan CSE Faculty-1 35
1st  Floor 201-B CSE Mr. Kulbhushan CSE Faculty-1 35
1st  Floor 201-C CSE Mr. Kulbhushan CSE Faculty-1 35
1st  Floor 201-D IT Ms. Somya IT Faculty-1 35
1st  Floor 206 IT Mr. Santosh IT Faculty-2 30
7th Floor 805-A IT Mr. Sidharth IT Faculty-3 30
7th Floor 805-B CSE Mr. Sidharth CSE Faculty-2 35
7th Floor 805-C CSE Mr. Paras CSE Faculty-3 35
7th Floor 805-D CSE Mr. Paras CSE Faculty-3 35
7th Floor 805-E BIOTECH Ms. Shikha Biotech Faculty-1 35
8th Floor 905 BIOTECH Mr. Sachin Biotech Faculty-2 40
SET 1  314 MCA Ms. Shikha MCA Faculty 1 50
SET 1  402 EIE Ms. Somya EIE Faculty 1 30
RAC CIVIL Civil Faculty-2 35

CoCubes Pre-Assessment Program  Date:- 17/1/14 (1:00 PM - 4:00 PM)
Floor Lab No Department DCA Coordinator Faculty Coordinator Number of students
1st  Floor 201-A ME Mr. Kulbhushan ME Faculty-1 35
1st  Floor 201-B ME Mr. Kulbhushan ME Faculty-1 35
1st  Floor 201-C ME Mr. Paras ME Faculty-2 35
1st  Floor 201-D ME Mr. Paras ME Faculty-2 35
1st  Floor 206 ME Mr. Sachin ME Faculty-3 30
7th Floor 805-A ME Mr. Sidharth ME Faculty-4 30
7th Floor 805-B ME Mr. Sidharth ME Faculty-4 35
7th Floor 805-C AE Mr. Paras AE Faculty-1 35
SET 1  314 CIVIL Mr. Kulbhushan Civil Faculty-1 50
SET 1  402 CIVIL Mr. Kulbhushan Civil Faculty-1 35
RAC CIVIL Civil Faculty-2 35

CoCubes Pre-Assessment Program  Date:- 17/1/14 (4:30 PM - 7:30 PM)
Floor Lab No Department DCA Coordinator Faculty Coordinator Number of students
1st  Floor 201-A ECE Mr. Kulbhushan ECE Faculty-1 35
1st  Floor 201-B ECE Mr. Kulbhushan ECE Faculty-1 35
1st  Floor 201-C ECE Mr. Kulbhushan ECE Faculty-1 35
1st  Floor 201-D ECE Ms. Somya ECE Faculty-2 35
1st  Floor 206 ECE Mr. Santosh ECE Faculty-3 30
7th Floor 805-A ECE Mr. Sidharth ECE Faculty-4 30
7th Floor 805-B ECE Mr. Sidharth ECE Faculty-4 35
7th Floor 805-C ECE Mr. Paras ECE Faculty-5 35
7th Floor 805-D ECE Mr. Paras ECE Faculty-5 35
7th Floor 805-E EEE Mr. Sachin EEE Faculty 1 35
8th Floor 905 EEE Mr. Sachin EEE Faculty 2 35
SET 1 314 EEE Ms. Shikha EEE Faculty 3 35
SET 1 402 EEE Ms. Priyadarshi EEE Faculty 4 40
RAC CIVIL Mr. Sidharth Civil Faculty-3 30
RAC CIVIL Mr. Sidharth Civil Faculty-3 35

Course File on Irrigation Engg- CVL015

Thursday, January 9, 2014

QUESTION BANK

Following links will take you to the different question banks:
STEEL:

SURVEY:

ENV. ENGG:

RCC:

FH LAB:

IRRIGATION:

FM:

QUANTITY SURVEY:

Ad. RCC: